The Architecture Phase is crucial for creating detailed architectural and engineering drawings for submission to the local building department to obtain a construction permit. During this phase, architects and engineers work simultaneously on their respective drawings. The architect coordinates these engineering drawings with the architectural ones, ensuring that the design intent remains intact throughout the process. Here are the steps involved:

Design Development:

  1. Selection and Incorporation: All finishes, appliances, fixtures, windows, doors, millwork, and casework are selected and integrated into the construction document set. These elements are detailed in schedules and specification cut sheets.
  2. Preliminary Structural Drawings: While design development is underway, the engineer prepares preliminary structural drawings. If necessary, the civil engineer will develop grading and drainage drawings.

Detailed Architectural Drawings:

  1. Development: Once design development is complete, detailed architectural drawings are created. The scope of the project and the number of consultants involved will determine the number of drawing sheets in the construction document set, which can range from a few to over fifty.
  2. Assembly and Submission: After completing the drawings, along with structural calculations and reports (such as Title 24, Green Building, and Geotechnical), the architect assembles the necessary number of sets for submission. These are then submitted for “plan check” to the local building officials.

Plan Check Review:

  1. Concurrent Activities: During the plan check review, certain activities run concurrently, as detailed in the Construction Phase.
  2. Review and Response: Typically, the building official will provide comments on the submittal, which the architect and engineer address with revised drawings. Once the building official approves, the construction permit is issued, and construction can begin.

Owner Benefits:

  1. Decision Making: All specifications are finalized during the architectural phase, reducing the need to make selection decisions during construction under time constraints.
  2. Realistic Pricing: Comprehensive drawings enable subcontractors to provide realistic pricing, ensuring better budget management.

This structured approach ensures a smooth transition from design to construction, with clear communication and coordination between all parties involved.